Client Work
Case Studies
Real engagements, real results. Every case study includes the problem, our approach, and the measured outcome.
6 results
Battery Storage Peak-Shaving Deployment Cuts Demand Charges 19 Percent
The Archive Co designed and commissioned a 20 MW / 80 MWh battery storage system for CoastalGrid Cooperative, reducing wholesale demand charges by 19 percent in the first full year of operation.
19%
Demand Charge Reduction
20 MW / 80 MWh
System Size
Cutting Outage Minutes a Third Through Distribution Automation and DERMS
The Archive Co redesigned Meridian's distribution planning process and implemented a DERMS platform across 40 feeders, reducing customer outage minutes by 31 percent in eighteen months.
31%
SAIDI Reduction
40
Feeders Automated
Digital Twin Program Cuts Unplanned Downtime 22 Percent
A digital twin and predictive maintenance program for Solvantage's largest process line reduced unplanned downtime by 22 percent and paid for itself within a single planned outage cycle.
-22%
Unplanned Downtime
1 outage cycle
Payback Period
Electrolyzer Technology Selection and Feasibility for a 150 MW Hydrogen Hub
Independent technical and commercial feasibility study supported Vantage's final investment decision on a 150 MW green hydrogen production hub, including electrolyzer technology selection and offtake structuring guidance.
150 MW
Facility Capacity
3
Vendors Evaluated
Energy Recovery Retrofit Cuts Desalination Plant Energy Use 22 Percent
Retrofitting a legacy seawater reverse osmosis plant with modern isobaric energy recovery devices reduced specific energy consumption by 22 percent, lowering operating cost without expanding the plant's footprint.
22%
Energy Reduction
0
Service Interruptions
Redesigning Floating Foundations to Cut Steel Cost 18 Percent
Independent structural review and platform redesign for a 500 MW floating offshore wind project reduced foundation steel mass by 18 percent without compromising the certified design envelope.
18%
Steel Mass Reduction
-9%
Mooring Peak Tension