Electric Cooperative

Battery Storage Peak-Shaving Deployment Cuts Demand Charges 19 Percent

The Archive Co designed and commissioned a 20 MW / 80 MWh battery storage system for CoastalGrid Cooperative, reducing wholesale demand charges by 19 percent in the first full year of operation.

19%

Demand Charge Reduction

20 MW / 80 MWh

System Size

Read case study
Investor-Owned Utility

Cutting Outage Minutes a Third Through Distribution Automation and DERMS

The Archive Co redesigned Meridian's distribution planning process and implemented a DERMS platform across 40 feeders, reducing customer outage minutes by 31 percent in eighteen months.

31%

SAIDI Reduction

40

Feeders Automated

Read case study
Industrial Manufacturing

Digital Twin Program Cuts Unplanned Downtime 22 Percent

A digital twin and predictive maintenance program for Solvantage's largest process line reduced unplanned downtime by 22 percent and paid for itself within a single planned outage cycle.

-22%

Unplanned Downtime

1 outage cycle

Payback Period

Read case study
Green Hydrogen Developer

Electrolyzer Technology Selection and Feasibility for a 150 MW Hydrogen Hub

Independent technical and commercial feasibility study supported Vantage's final investment decision on a 150 MW green hydrogen production hub, including electrolyzer technology selection and offtake structuring guidance.

150 MW

Facility Capacity

3

Vendors Evaluated

Read case study
Municipal Water Authority

Energy Recovery Retrofit Cuts Desalination Plant Energy Use 22 Percent

Retrofitting a legacy seawater reverse osmosis plant with modern isobaric energy recovery devices reduced specific energy consumption by 22 percent, lowering operating cost without expanding the plant's footprint.

22%

Energy Reduction

0

Service Interruptions

Read case study
Offshore Wind Developer

Redesigning Floating Foundations to Cut Steel Cost 18 Percent

Independent structural review and platform redesign for a 500 MW floating offshore wind project reduced foundation steel mass by 18 percent without compromising the certified design envelope.

18%

Steel Mass Reduction

-9%

Mooring Peak Tension

Read case study